Saul East Phase 1
Location: City of Round Rock (Creek Bend / Wyoming Springs)
Lots: 103 Single Family Fee Simple
Acreage: 50 Acres
Construction Cost: Approximately $7.7M
General Contracting:
- 16,455 Lineal Feet of Utilities
- 161,920 Cubic Yards of Dirt Moved (including rock excavation)
- 27,430 Square Feet of Retaining Walls
- Various Karst Features
Saul East Phase 2
Location: City of Round Rock (Creek Bend / Wyoming Springs)
Lots: 122 Single Family Fee Simple
Acreage: 43 Acres
Construction Cost: Approximately $5.9M
General Contracting:
- 9,970 Lineal Feet of Utilities
- 162,080 Cubic Yards of Dirt Moved (including rock excavation)
- 23,568 Square Feet of Retaining Walls
- Various Karst Features
Wilson Trace
TopMar Construction installed additional wastewater and storm drain to service two commercial parcels along Brushy Creek Boulevard in the City of Cedar Park, Texas.
Location: City of Cedar Park – Brushy Creek Rd
Lots: 149 Single Family Detached Condo Units
Acreage: 71.56 Acres
General Contracting:
Managed various contractors for Grading, Ponds, Wet Utilities (Water, Wastewater, Storm Drain), Dry Utilities (PEC, Atmos, AT&T, Time Warner), Paving, and Concrete Work
• 21,596 Lineal Feet of Utilities
• 95,675 Cubic Yards of Dirt Moved
Development:
Assisted in successfully negotiated a comprehensive development agreement with the City of Cedar Park to oversee the entire project. As part of our management role, MileStone supervised the construction of the Amenity Center, which includes the pool, playscape, and bathrooms. Additionally, MileStone prairie built many of the units.
RM 150 Street Improvements
Arterial Road Improvements – Kyle, TX
Location: Hays County
Description: The project involves widening over 2,000 linear feet of RM-150 in collaboration with TxDOT. The expansion aims to enhance traffic flow and safety, with specific focus on accommodating the needs of the Sage Hollow project. This includes the addition of turn lanes to facilitate smoother traffic movements in the vicinity of Sage Hollow. Coordination was necessary for traffic controls to keep existing traffic moving smoothly.
General Contracting:
Subcontracted Grading, Wet Utilities (Storm Drain), Paving, and Concrete Work
• 134 Lineal Feet of Utilities
• 2,910 Cubic Yards of Dirt Moved